Project consists of the construction of three sewer treatment plants and collector sewer pipes for the plant.
|

|
      Dexter Construction crew installing 20' lengths of 24" PVC force mains.
|

|
      Tight trenches in residential streets.
|

|
      THE 1 METER DOUBLE ROLLING STRUT. Utilizing our 39" Double Roll Strut, we were able to provide the narrowest inside dimension with all the features of our larger systems. The bolt-in expansion beams provide greater widths as needed.
|

|
      The system was easily handled with a Komatsu PC 300LC
      Representatives from Dexter Construction attended the most recent NUCA convention. They told us after visiting with all of the slide rail manufacturers, they took their time to compare the manufacturers and came to a conclusion. They chose American Shoring for their project. We delivered the equipment on time with our own trucks. We supervised the installation, which went flawlessly. For more information on our trucking, click here to visit our trucking website (www.maragliano.com)..
|