Halifax Harbor Solution Project
This Canadian project construction consisted of three sewer treatment plants and collector sewer pipes for the plant where the construction crew installed 20' lengths of 24" PVC force mains.
Because of tight trenches in residential streets, we utilized our 39" Double Roll Strut, and were able to provide the narrowest inside dimension with all the features of our larger

systems.
The bolt-in expansion beams provided greater widths as needed, and the system was easily handled with a Komatsu PC 300LC.
Representatives from the construction company attended the most recent NUCA convention. They told us after visiting with all the slide rail manufacturers, they took their time to compare manufacturers and came to one conclusion: American Shoring. We delivered the equipment on time with our own trucks, and supervised the installation.